Number of Units
Trinity Park: 132 units
Location
Holland-on-Sea, Clacton, Essex
Awards
Quality Recognition Award
We spoke to EJT Construction Head of Construction Division Phil Brown about the unique challenges that the Trinity Park site team overcame - from relocating reptiles to steering through global instability - as well as the importance of high standards on site.
The award-winning team in Clacton, Essex were awarded a Premier Guarantee Quality Recognition Award last year.
EJT Construction are part of the EJT Group and provide all the expertise of a main contractor alongside in-house civils and groundworks.
We find working with the Premier Guarantee team a very positive experience - from our regular site inspections, the thorough reports we receive, through to uploading data onto their portal and obtaining certification.
Premier Guarantee’s site and head office teams are very proactive making the entire process a pleasant experience.
The project being constructed for our client Home Group Ltd comprises 132 homes of mixed tenure, made up of 95 Shared Ownership and 37 Affordable Rent homes. They are traditionally built bungalows and two storey houses. Two of the bungalows are M4 (3) compliant for Shared Ownership, which is unusual and will greatly benefit those with needs requiring this type of home looking to get on the housing ladder.
The scheme includes an extensive public open space green area, of more than four hectares, including a RoSPA approved children’s play area, contoured play and footpaths through open wildflower meadows, as well as water features for the local community
A significant element to this project is the introduction of a new roundabout at the entrance of the development, including the renewal of local highway footpaths to link this new development to local amenities
Ecology Translocation
This area is home to both common lizards and slow worms which were abundant in numbers on this site.
Working closely with our ecology consultant, we undertook a planned translocation of these protected species to neighbouring land. The ecologists weren’t prepared for the considerable number and frequency of reptiles caught and our strategy to create a presence-absence site took several gear changes by EJT to achieve our programmed start of construction on site for our client.
We created several new nesting and sunbathing sites outside the project boundary to ensure trapped reptiles weren’t tempted to re-enter, and adopted a painstaking process of hand tool habitat removal to ensure no reptiles were harmed when construction activities commenced.
We are overwhelmingly proud that we were able to relocate so many, which will hopefully make new homes in the green spaces we have now produced as part of the site-wide design.
High Water Table
Constructing the residential area and public open space required a substantial earthmoving exercise on land with a very high water table. To facilitate these works effectively, EJT engineered a site-wide dewatering mechanism through the permanent drainage system, whilst balancing the generated muck through strategic design of the public open space. This, in turn, reduced the site’s carbon footprint by eradicating disposal of muck from site.
New roundabout
The requirement of a new roundabout has been challenging. Designed and approved through a Section 278, not only was this new highway work located on a small country lane, but it also included the facilitation of construction deliveries on a 90-degree bend. All the while, maintaining positive local support.
Fortunately, EJT Construction benefits from an in-house civil engineering and groundworks division which enables us to seamlessly coordinate the construction teams on site. This allows us to work as one team with the same objective and, through regular dialogue with community partners, we have now completed 95% of these disruptive works with only a handful of queries from local residences.
Sector inflation
As everyone in all industries is aware, the difficult financial climate we find ourselves in has influenced the sourcing and procurement of materials.
With price increases and shortages of certain materials, we have had to monitor and manage the situation diligently in order not to impact the scheme. With our dedicated in-house procurement, design and surveying teams, along with trusted supply partners and sub-contractors, we have worked tirelessly to maintain cost control across the project.
We find working with the Premier Guarantee team a very positive experience. From our regular site inspections, the thorough reports we receive, through to uploading data onto their portal and obtaining certification – Premier Guarantee’s site and head office teams are very proactive making the entire process a pleasant experience.
A huge thank you to Scott Harris and the rest of the Premier Guarantee team.
It is of fundamental importance to EJT Construction that site cleanliness and general appearance is the best it can be.
This creates a positive mindset for those working on site which in turn enhances overall efficiency in a quality driven environment where operatives are happy to come to work and are motivated to maintain high standards.
We too believe successful teamwork is achieved through a collaborative mindset with effective communication and integrity from all parties.
This is the first time EJT Construction has collaborated with Home Group and we have formed a strong partnering relationship with all levels of their organisation. Their commitment to delivering quality housing for their clients aligns with that of EJT Construction and we very much look forward to the successful delivery of this and future projects with them.
Our partnering relationship with Premier Guarantee means we’re not afraid to raise issues or clarification on a detail or regulation - knowing that we will receive positive feedback and assistance when it is requested. This partnering teamwork is invaluable and is why we return to Premier Guarantee on all main contract projects.
It is of fundamental importance to EJT Construction that site cleanliness and general appearance is the best it can be. This creates a positive mindset for those working on site which in turn enhances overall efficiency in a quality driven environment where operatives are happy to come to work and are motivated to maintain high standards.
The key, as a main contractor, is to lead by example and to provide adequate resources, plant and material to achieve this high standard.
Winning this award means a great deal to EJT Construction and Home Group and makes everyone involved feel appreciated for their hard work. It formally symbolises their professionalism and commitment to delivering a quality product to be proud of. We cannot thank Premier enough for this award, and acknowledging the workmanship, hard work and dedication of our entire Project Team.
Working with well-established and trusted sub-contractors over many years is essential to the high standards of HSEQ. These sub-contractors know exactly how an EJT Construction site is run from tender stage enabling them to maximise their own efficiencies with respect to quality control, procedures and expectation.
We are also proud to say that, although only needing to achieve Secured By Design - Silver status, it has been expressed that the project is looking to be upgraded to Gold Status due to the design implemented and the finished product.
Winning this award means a great deal to EJT Construction and Home Group and makes everyone involved feel appreciated for their hard work.
It formally symbolises their professionalism and commitment to delivering a quality product to be proud of.
We cannot thank Premier enough for this award, and acknowledging the workmanship, hard work and dedication of our entire Project Team.
The use of open natural water retention swale systems onsite was important to EJT for the vast ongoing gain in biodiversity.
This system will remain in place for the lifecycle of the development and will receive ongoing maintenance to ensure its performance both systematically and ecologically.
The ecological benefits from the presence of fresh water are immeasurable. This is the only body of fresh still water in a 1.6km radius, attracting a multitude of birds and other animals.
This area in particular had issues with localised flooding and the swale will not only collect surface water run-off but also naturally occurring ground water. Its controlled release into the existing water network will reduce the severity of previous flood events to existing local community
They will be moving into a exceptionally-well constructed home, consisting of high-quality materials, built to a standard of workmanship and pride for which EJT is well known.
EJT Construction has a well-established Customer Care department which will ensure that the residents’ concerns are addressed swiftly and to the quality expected in an industry often tainted with bad press on snagging and accountability.
A comprehensive Home Users Guide Pack will be provided with every property and will include all relevant contact information for utilities, local area information, and a guide to the property itself.
EJT Construction has a multitude of schemes for our contracting clients in the planning and pre-construction stages, ranging from 12 to 180 units. Additionally, the EJT Group has developments under its own brand 'Esmera Homes' which are in planning and construction stages. We’re excited to establish this Brand as a trusted and respected developer known for its commitment to quality and excellence.
We look forward to forging deeper relationships with Home Group by identify opportunities for collaboration and win more awards together, building on the exceptional achievements of Trinity Park.
We will continue our partnering relationship with Premier Guarantee, both in warranty and building control, and highly promote them as the leading provider of these services to our clients and purchasers alike.
We look forward to overcoming the challenges of 2024 and to a prosperous 2025 and beyond.
Request a call back and discuss your next project with one of our account managers