Download the PDF version of this article
Roof Terraces and Balconies – Roof Terraces
Where the roof terrace abuts a wall, the waterproofing layer must extend 150mm up the wall to form an upstand. The waterproofing layer must be situated under a cavity tray to ensure the cavity fully drains with weep holes being provided in masonry walls at 900mm centres. The upstand height may be reduced to 75mm for level access threshold detailing as per the below guidance.
The total roof terrace zone depth should be assessed at critical points, to ensure there is enough space to provide a 150mm upstand to provide waterproofing protection above finished roof level. It is important that this minimum 150mm upstand is maintained at all points around the waterproofed area.
Downstands (of separate metal or other flashings) should lap the upstand by a minimum of 75mm
Where a door threshold is less than 150mm above the roof terrace drainage layer and there is a requirement for level access, the following provisions must be satisfied:
This guidance should be read in conjunction with guidance in the ‘Roofs – Flat Roofs’ section of our Technical Manual for falls, outlets and overflows.
Roof terraces must have at least one outlet and an overflow to drain and warn of outlet/downpipe blockage and so avoid the risk of flooding or structural overloading.
Decking and/or paving should not impede on the drainage of water to rainwater outlets. To ensure adequate drainage, the designer should ensure the following:
The capacity of the overflow should be not less than that of the outlet or combined outlets, and its discharge should be visible but directed away from the building. Overflows should be conspicuously positioned for inspection and as close to the outlets as practicable to avoid rainwater build up on roofs.
The overflow level should be set at the design water level for the rainwater outlets, which in most instances is typically 30-35 mm above the outlet. Where there is a sump included at the rainwater outlet position, the overflow should be set at the level of the lip into that sump. The level of overflows should be 25 mm below the underside of the any sill positions e.g. thresholds.
A 150mm splash barrier should be provided around the perimeter to ensure water does not reach any part of a wall.
An impervious wall finish or cladding may be used as a splash barrier. Alternatively, the waterproofing layer can be extended to form an upstand with cover flashing and a cavity tray. Impervious masonry units with porous bed joints are unsuitable within this zone.
Parapets are inherently a high risk form of construction due to the fact that they’re so exposed to the elements and because of the careful detailing required.
Where parapets are specified, they should incorporate at least 3 lines of defence to protect against water penetration. The 3 lines of defence include:
All parapets should be designed in line with the guidance provided in our ‘External Walls – Parapets’ section of our Technical Manual.
Guard rails and balustrades should ideally be mounted to the sides of the parapets, either internally or externally via face fixings into the parapet wall and not through the coping. This should be the preferred method as it prevents creating weak spots for water ingress.
In addition, the following must be taken into account by the designer:
Where fixing of guard rails and/or balustrades through the waterproof membrane cannot be avoided, the fixings must be carefully specified to ensure they are robust and they do not comprise the waterproof membrane. Any penetrations through the waterproof membrane are to be sealed correctly in accordance with the product manufacturer’s recommendations.
Materials used in coastal locations (and other aggressive environments) must be suitable to resist corrosion.
Detailing for penetrations in the roof terrace must incorporate an upstand which is a minimum 150mm above the surface treatment. Downstands (of separate metal or other flashings) should lap the upstand by a minimum 75mm.
Notes:
Read more articles on InSite and sign up to receive our blog round-up.
Every care was taken to ensure the information in this article was correct at the time of publication (September 2024). Guidance provided does not replace the reader’s professional judgement and any construction project should comply with the relevant Building Regulations or applicable technical standards. For the most up to date Premier Guarantee technical guidance please refer to your Risk Management Surveyor and the latest version of the Premier Guarantee Technical Manual.
Ref: KM-3735